Tahoe-Central Sierra Project Tracker
Project Tracker
  • About
    • ABOUT TCS PROJECT TRACKER
    • CONTACT US
  • Projects
    • Project Map
    • Full Project List
  • Program Info
    • Focus Areas
    • Pillars of Resilience
    • Performance Measures
    • Counties
    • National Forests
    • Watersheds - HUC 10
    • Watersheds - HUC 8
    • WUI Zones
    • Organizations
    • Funding Sources
    • Web Services
  • Results
    • Accomplishment Dashboard
  • Reports
    • Projects
  • Log In Toggle Dropdown
    • Forgot Password
    • Request Account
  • Help
    • Request Support
    • Training
    • Release Notes
    • About ProjectFirma
View Fact Sheet

Clancy-Pohl Sensitive Land Acquisition

This Project is sourced from EIP Project Tracker
Back to all Projects
Forecasted
Planning/Design
Implementation
Post-Implementation
Completed

Contents

Project Overview

Basics

Sustainable Recreation and Natural Resource Stewardship
Ecologically Responsible Recreation and Natural Resource Protection
Acquire Lands to Protect/Conserve Natural Resources
Clancy-Pohl Sensitive Land Acquisition

Implementation
The State of NV through the NV Land Bank acquired 7.67 acres of sensitive land in the Granite Springs Subdivision in Lower Kingsbury, Douglas County in 2017. Edgewood Creek flows through the lower portion of the parcel. The land was verified by TRPA as land capability districts 1b, 1a, 2, 4, and 6 and contains 22,483 square feet of existing/potential land coverage. Existing land coverage/disturbance is being restored using several available funding sources. Land coverage/disturbance restored with TRPA Excess Mitigation Funds will be permanently retired. The NV Land Bank is permanently retiring the parcel from future development and managing the parcel for environmental benefits.

2017
2017
2025
2/19/2025

Project Attributes

Footprint Acres
None

Location

To zoom, hold down Shift and drag a rectangle.
1318-26-501-004, 173 Granite Springs Drive

None Selected


None Selected


None Selected


None Selected


None Selected

Organizations

Funders
  • Nevada Tahoe Resource Team – Nevada Division of State Lands
  • Tahoe Regional Planning Agency
Lead Implementer
  • Nevada Tahoe Resource Team – Nevada Division of State Lands
Partner
  • Nevada Tahoe Resource Team

Contacts

Christopher LaCasse (chris.lacasse@lands.nv.gov)

Performance Measures

Expected Performance Measures

Acres of Environmentally Sensitive Land Acquired 7.67 acres
Acres of Environmentally Sensitive Land Acquired Not Provided

Reported Performance Measures

Acres of Environmentally Sensitive Land Acquired
Total 2024 2023 2022 2021 2020 2019 2018 2017 Units
7.67 N/A N/A N/A N/A N/A 0 0 7.67 acres
Total 7.67 0 0 0 0 0 0 0 7.67 acres

Acres of Forest Fuels Reduction Treatment
Critical Zone Treatment Phases Treatment Type Total 2024 2023 2022 2021 2020 2019 2018 2017 Units
Unspecified Unspecified Hand Thinning 7.67 N/A N/A N/A N/A N/A N/A 7.67 N/A acres
Total 7.67 0 0 0 0 0 0 7.67 0 acres

Acres of Habitat Restored/Created
Action Taken Habitat Type Treatment Type Total 2024 2023 2022 2021 2020 2019 2018 2017 Units
Unspecified Unspecified Unknown 4.07 0 2 0.07 1 N/A 1 N/A N/A acres
Total 4.07 0 2 0.07 1 0 1 0 0 acres

Acres Treated for Invasive Species
Form of Removal Invasive Species Type Level of Treatment Total 2024 2023 2022 2021 2020 2019 2018 2017 Units
Unspecified Terrestrial Unspecified 1.1 0 0.4 0 0.3 0.2 0 0.2 0 acres
Total 1.1 0 0.4 0 0.3 0.2 0 0.2 0 acres

Financials

Budget

$1,287,589.00
$1,287,589.00
$0.00
$0.00
Total
Excess Coverage Mitigation Funds (TPRA) $35,000.00 $0.00 $35,000.00
Nevada Land Bank (NDSL) $75,000.00 $0.00 $75,000.00
Tahoe Regional Planning Agency (TPRA) $1,177,589.00 $0.00 $1,177,589.00
Total $1,287,589.00 $0.00 $1,287,589.00
Comment: None provided

Reported Expenditures

2017 2018 2019 2020 2021 2022 2023 2024 2025 Total
Excess Coverage Mitigation Funds (TPRA) $1,177,589.00 $0.00 $0.00 $0.00 $1,500.00 $15,494.00 $0.00 $0.00 $0.00 $1,194,583.00
Nevada Land Bank (NDSL) $75,000.00 $0.00 $8,812.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $83,812.00
Grand Total $1,252,589.00 $0.00 $8,812.00 $0.00 $1,500.00 $15,494.00 $0.00 $0.00 $0.00 $1,278,395.00

Note: None provided

Pillars of Resilience

Pillars of Resilience

Project Details

Attachments

No attachments

No attachments

Notes

12/16/2024 2:31 PM System NDSL is currently waiting confirmation from TRPA that 94% of the coverage will be retired and 6% will be used to replenish the Nevada Land Bank's supply and ultimately sold to the public.
01/24/2024 2:58 PM System NDSL Foresters worked on invasive weed removal, mulching, seeding over the summer of 2023. Spotted knapweed was noted and removed offsite. Seeding and mulching was applied over 2 acres. BMP erosion control measures were removed from site. Several potential hazard tree snags were removed.
12/27/2022 10:40 AM System During the month of October 2022 NDSL removed 3,084 square feet of non-permeable asphalt surface from the state-owned forested parcel in Douglas County off of Highway 207. Compost was delivered to the site to improve the underlying soils, and snow interspaces were seeded in November of 2022. Seeding treatments will be reapplied in the Spring of 2023 and native conifer seedlings will be planted in the restoration area.
01/06/2022 10:42 AM System The parcel had a large hole for a building pad when it was acquired. NDSL was able to utilize soil from the Lake Tahoe Basin excavated for the Spooner Front Country Improvements Phase 1 Visitor Center and Amphitheater project to fill in the excavation of the building pad. Once the foundation was filled in it was graded to match the contour of the surrounding land. After the grading was complete BMP measures were installed which included a silt fence, straw waddles, and pine straw mulch. A seed mix of a native vegetation was applied to the treated area. Spotted Knapweed was found on the parcel in October 2021 along the road corridor leading into the parcel. The spotted knapweed was hand pulled and disposed of in double bagged heavy duty garbage bags. Cheatgrass was hand pulled in June 2021 by members of the Nevada Tahoe Resource Team and properly disposed of properly.
01/15/2021 3:35 PM System In September 2020, the Nevada Tahoe Resource Team monitored the ninety-five Jeffrey and Ponderosa pine seedlings that were transplanted in 2019 and documented less than 5% mortality rate. Cheatgrass was hand pulled in the road corridor and disposed of in heavy duty plastic trash bags.
01/08/2020 10:50 AM System Utility removal and transplanting took place during spring and summer 2019 (Phase 1 of restoration). Electrical wiring, bollards, a transformer box, concrete pad, two concrete vaults, and conduit (sewer, water, and electric) were excavated/removed from the utility corridor on site (1/4 acre). Ninety-five Jeffrey and Ponderosa pine seedlings were transplanted from the disturbed building pad area to the steep slope on site uphill of Edgewood Creek in an effort to stabilize soils and reduce erosion (outplanting on 1 acre). Additional restoration treatments to return the building pad cut slope to grade, seed, and remove and restore the asphalt driveway are planned for summer 2020.
01/09/2019 2:15 PM System Two non-native plant species, Cheatgrass and tumble mustard, were weeded from disturbance areas on the parcel in Summer 2018. Trees that have established in the building pad area and have a high likelyhood of survival will be transplanted in Spring 2019. Land coverage restoration including slope recontouring and native plant community establishment is planned for Summer 2019. Once coverage is verified by TRPA as banked, NDSL will retire coverage purchased with TRPA Excess Land Coverage Mitigation Fees.
02/06/2018 4:01 PM System Land coverage restoration is planned for Spring of 2018. Once coverage is verified by TRPA as banked, NDSL will retire coverage purchased with TRPA Excess Land Coverage Mitigation Fees.
01/12/2018 4:12 PM System Total purchase price of acquisition was $1,252,588.87 and closed escrow on 11/30/2017. Excess Mitigation funds were used in the amount of $1,177,588.87. The remaining $75,000.00 was expended from restoration funds in order to secure a small portion of the coverage to replenish the Land Bank and offered for sale to the public.

External Links

  • Nevada Land Bank

Photos

Photos

  •  

    Access pre-restoration
(Timing: Before) (~1,856 KB)
Credit: NDSL

    Access pre-restoration
    (Timing: Before) (~1,856 KB)
  •  

    access pre-restoration
(Timing: Before) (~2,006 KB)
Credit: NDSL

    access pre-restoration
    (Timing: Before) (~2,006 KB)
  •  

    Building pad after being filled in and graded to match the contour of the surrounding land. BMP measures were installed, and the treated area was seeded with a mix of native species. 
(Timing: During) (~2,759 KB)
Credit: NDSL

    Building pad after being filled in and graded to match the contour of the surrounding land. BMP measures were installed, and the treated area was seeded with a mix of native species.
    (Timing: During) (~2,759 KB)
  •  

    Building pad pre-restoration
(Timing: Before) (~3,942 KB)
Credit: NDSL

    Building pad pre-restoration
    (Timing: Before) (~3,942 KB)
  •  

    During the month of October 2022 NDSL removed 3,084 square feet of non-permeable asphalt surface from the state-owned forested parcel in Douglas County off of Highway 207.
(Timing: During) (~3,286 KB)
Credit: NDSL

    During the month of October 2022 NDSL removed 3,084 square feet of non-permeable asphalt surface from the state-owned forested parcel in Douglas County off of Highway 207.
    (Timing: During) (~3,286 KB)
  •  

    Site photo pre-restoration
(Timing: Before) (~1,829 KB)
Credit: NDSL

    Site photo pre-restoration
    (Timing: Before) (~1,829 KB)
  •  

    Site photo pre-restoration
(Timing: Before) (~1,989 KB)
Credit: NDSL

    Site photo pre-restoration
    (Timing: Before) (~1,989 KB)
  •  

    Site photo pre-restoration
(Timing: Before) (~2,176 KB)
Credit: NDSL

    Site photo pre-restoration
    (Timing: Before) (~2,176 KB)
  •  

    Slope cut pre-restoration
(Timing: Before) (~4,540 KB)
Credit: NDSL

    Slope cut pre-restoration
    (Timing: Before) (~4,540 KB)
  •  

    Transformer box, utility vaults, and bollards
(Timing: Before) (~3,862 KB)
Credit: NDSL

    Transformer box, utility vaults, and bollards
    (Timing: Before) (~3,862 KB)
  •  

    Transplanted pine seedlings
(Timing: After) (~1,991 KB)
Credit: NDSL

    Transplanted pine seedlings
    (Timing: After) (~1,991 KB)
  •  

    Utility lines pre-restoration
(Timing: Before) (~4,520 KB)
Credit: NDSL

    Utility lines pre-restoration
    (Timing: Before) (~4,520 KB)
  •  

    Utility lines removed and temporary BMPs in place on slopes
(Timing: During) (~1,102 KB)
Credit: NDSL

    Utility lines removed and temporary BMPs in place on slopes
    (Timing: During) (~1,102 KB)
  •  

    Utility vaults, transformer box, and bollards
(Timing: Before) (~483 KB)
Credit: NDSL

    Utility vaults, transformer box, and bollards
    (Timing: Before) (~483 KB)

Credits: The Tahoe Central Sierra Project Tracker tool has been developed through generous funding from the California Tahoe Conservancy. This project tracker was created and developed by TCSI and Environmental Science Associates.

ProjectFirma is a service provided by Environmental Science Associates (ESA), which builds on the Tahoe Regional Planning Agency's EIP Project Tracker. This program is free software; you can redistribute it and/or modify it under the terms of the GNU Affero General Public License as published by the Free Software Foundation. Source code is available on GitHub.

Copyright (C) 2025 Tahoe Regional Planning Agency and ESA | Code last updated (compiled) at 2025-06-10 17:17:29.