Tahoe-Central Sierra Project Tracker
Project Tracker
  • About
    • ABOUT TCS PROJECT TRACKER
    • CONTACT US
  • Projects
    • Project Map
    • Full Project List
  • Program Info
    • Focus Areas
    • Pillars of Resilience
    • Performance Measures
    • Counties
    • National Forests
    • Watersheds - HUC 10
    • Watersheds - HUC 8
    • WUI Zones
    • Organizations
    • Funding Sources
    • Web Services
  • Results
    • Accomplishment Dashboard
  • Reports
    • Projects
  • Log In Toggle Dropdown
    • Forgot Password
    • Request Account
  • Help
    • Request Support
    • Training
    • Release Notes
    • About ProjectFirma
View Fact Sheet

Upper Keller Canyon Drainage and Erosion Control Project

This Project is sourced from EIP Project Tracker
Back to all Projects
Forecasted
Planning/Design
Implementation
Post-Implementation
Completed

Contents

Project Overview

Basics

Water Security and Riparian Heath
Hydrologic Integrity
Stormwater Management
Upper Keller Canyon Drainage and Erosion Control Project

Planning/Design
Steep eroding slopes, road cuts and concentrated drainage into unprotected road shoulders result in significant erosion and drainage issues in steep, erosion prone slopes and creates flooding and drainage issues for residents. Existing site conditions include inadequate rock lined channels on steep slopes that are overwhelmed during high intensity precipitation events. Project work will include adding in additional storm drain inlets, adding subsurface storm drain pipes that will connect rock-lined channels, and constructing basins where feasible.

2028
2032
2034
1/14/2025

Project Attributes

Footprint Acres
None

Location

To zoom, hold down Shift and drag a rectangle.
see detailed location

  • El Dorado

  • Lake Tahoe Basin Management Unit
  • Not in a National Forest

  • Marlette Lake-Frontal Lake Tahoe (1605010102)

  • Lake Tahoe (16050101)

  • WUI Defense

Organizations

Lead Implementer
  • City of South Lake Tahoe

Contacts

Stephen Anderjack (sanderjack@cityofslt.us)

Performance Measures

Expected Performance Measures

No expected Performance Measures set for this Project.

Reported Performance Measures

Reported Performance Measures are not relevant for Projects in the Planning/Design stage.

Financials

Budget

$4,000,000.00
$0.00
$0.00
$4,000,000.00

No Funding Sources identified for this Project.


Comment: None provided

Reported Expenditures

No Expenditures have been reported for this Project.


Note: No expenditures reported in the EIP Project Tracker.

Pillars of Resilience

Pillars of Resilience

Project Details

Attachments

No attachments

No attachments

Notes

No Notes entered.

External Links

No External Links entered.

Photos

Photos

No Photos available.

Credits: The Tahoe Central Sierra Project Tracker tool has been developed through generous funding from the California Tahoe Conservancy. This project tracker was created and developed by TCSI and Environmental Science Associates.

ProjectFirma is a service provided by Environmental Science Associates (ESA), which builds on the Tahoe Regional Planning Agency's EIP Project Tracker. This program is free software; you can redistribute it and/or modify it under the terms of the GNU Affero General Public License as published by the Free Software Foundation. Source code is available on GitHub.

Copyright (C) 2025 Tahoe Regional Planning Agency and ESA | Code last updated (compiled) at 2025-06-10 17:17:29.