Miles of Infrastructure Improved and Inspected for Fire-Safe Practices (Reduction from High to Med Structural Exposure Score (Pyrologix)
Basics
Miles of Infrastructure Improved and Inspected for Fire-Safe Practices (Reduction from High to Med Structural Exposure Score (Pyrologix)
Outcome
Mile (miles)
Distance of infrastructure that has been enhanced to reduce the exposure and vulnerability to wildfire, based on Pyrologix fire risk models.
Related Focus Area Association
Map
To zoom, hold down Shift and drag a rectangle.
Accomplishments
Expected Performance Measure Results per Project
Reported Performance Measure Results per Project
Additional Information
Reporting Guidance
Critical Definitions
Project Reporting Instructions
Performance Measure Subcategory
Name |
|
---|---|
Infrastructure Type Inspected |
Utility Corridors, Unspecified
|
Targets by Geospatial Area
The following Geospatial Areas have or should have Projects that contribute results for this Performance Measure. If a Geospatial Area has a Target value it is displayed below.